Solrite
1 / 10
Solrite Electric · Texas

See it on your home.

Type your address. Everything after this gets built around it.

Power your home on your terms.

Texas homes on Oncor, CenterPoint, AEP Central, AEP North, TNMP and Lubbock. We don't save this — it's only used to pull a photo of the house.

Your bill today

What do you pay now?

–¢

Type the two numbers off the bill and this fills itself in.

Abundance Energy
See the EFL ↗
Wires company (TDU)
Electricity plan
System
When the grid goes down

A normal day.Your house: still on.

Grid outage
Your numbers
$0
less every month.

Enter the bill on to see your numbers.

Monthly total and kWh off the bill. The chart shown is an example at $190 and 1,200 kWh.

20-year projection, cumulative
Tap a year to compare
What gets installed
0
kWh

Duracell Power Center.

Whole-home backup, AC included. Installed, owned and maintained by Solrite for the whole term.

Backup
Whole home, AC included
Solar
Works with or without panels
Battery
60 kWh · 3 × 4 modules
App
Production, storage, backup — live
Monitoring
Live in the app
Battery
60 kWh · 3 × 4 modules
Inverter
Whole home, AC included
What a battery costs to buy, installed
$12,000
down. Nothing to buy. Nothing to finance.
Down payment
—
Equipment
—
Install & permits
—
Repairs & maintenance
—
Credit check
—

$20/mo fixed for 20 years · electricity on a 12-month fixed plan. Solrite owns the system and keeps it running for the whole term.

What changes for you
Lights.
Fridge.
AC.
Through the night.

Whole-home backup, AC included. When the grid drops, the house doesn't notice. No generator noise, no fuel runs, no extension cords.

0
hours of backup
Lights
Fridge
AC
Wi-Fi
The real process

Seven steps. One text thread.

1
2
3
4
5
6
7

Handoff

You're introduced to your Solrite liaison in one group text: you, your rep, and Solrite Ops. Every question, every update, one place.

Planset

An engineer reviews your survey and designs the installation — battery wall, wiring, the whole job.

City & utility

We submit the approved design to your city for permits and to your utility for interconnection.

NTP · Scheduling

When the city and utility approve, Solrite issues the Notice to Proceed and we reach out to schedule your install.

M1 · Install

The crew mounts and wires the system.

M2 · Inspection

Install complete and cleared for inspection.

PTO · Live

Permission to Operate: your system is on.

You

Step 3You'll sign an Interconnection Agreement — the utility needs your signature. We'll reach out when it's ready.

Texas utilities
5–15
business days

After we submit the approved design. Your signed agreement goes in with it.

City & utility approval · business days
051015
What a battery actually costs

Four ways to get backup power.

60 kWh Duracell · here
Where you land

Your home

Somewhere in Texas

See the EFL ↗
See if I qualify → Call or text 346.398.3638
Texas only · Oncor, CenterPoint, AEP Central, AEP North, TNMP · Lubbock on UpGrid · hello@vppsolrite.com